Cincinnati Insurance Hail Roof, Bronze W-Valley & Gutter Guard Upgrade in Gainesville, GA
Just 48 hours after Roof Repair Specialists inspected this sprawling 4,615 sq. ft. North Hall brick ranch on August 11, Cincinnati Insurance approved full hail replacement. Scheduled for a cooler-weather build on September 30, our crew installed 53.33 squares of TAMKO Titan XT® (Thunderstorm Gray) backed by MasterGuard™ Warranty protection, 110 LF of 18-inch Dark Bronze open W-valley metal, 192 LF of ridge vent, and 180 LF of LeafBlaster Pro™ gutter guards, documented by 308 total photos.
How We Restored This Steep-Slope Gainesville Roof in 2 Days
Set on a wooded lot in the North Hall and Lake Lanier corridor of Gainesville, GA, this sprawling single-story brick ranch spans 4,615 sq. ft. measured area (53.33 squares installed with steep-cut waste) across 12 facets, featuring multi-wing gables, 92' 7" of intersecting valleys, 167 LF of ridges, and 411 LF of perimeter eaves and rakes. Following winter hail damage, the homeowner partnered with us to restore the roof and upgrade long-term drainage with open metal valleys and micro-mesh gutter protection.
On August 11, 2026, our team conducted a drone diagnostic across all 12 facets, and Cincinnati Insurance inspected that same afternoon. Just 48 hours later on August 13, Cincinnati approved full roof replacement covering 46.15 SQ tear-off, 407.50 LF drip edge and starter, 309.24 sq. ft. Ice & Water barrier, and 167.55 LF ridge cap. However, our audit still flagged critical shortfalls: the 6.2% waste allowance left minimal margin for 92' 7" of valleys, Cincinnati scoped only 80 LF of ridge vent across 167 LF of ridges, and the scope omitted 44' 9" of sidewall step flashing.
Just 48 hours after our August 11 inspection, Cincinnati Insurance approved full replacement of this 4,615 sq. ft. North Hall brick ranch, allowing the homeowner to upgrade to 53.33 squares of TAMKO Titan XT® (Thunderstorm Gray) with MasterGuard™ warranty, 110 LF of 18" Dark Bronze W-valley metal, and 180 LF of LeafBlaster Pro™ gutter guards.
On August 18, 2026, the homeowner selected TAMKO Pro Diamond-installed TAMKO Titan XT® architectural shingles in Thunderstorm Gray paired with three performance upgrades: the upgraded TAMKO MasterGuard™ Warranty, 110 LF of 18-inch Dark Bronze W-Valley metal replacing standard closed-cut shingle valleys, and 180 LF of LeafBlaster Pro™ stainless micro-mesh gutter guards, scheduled for a cooler-weather September 30 build.
On Wednesday, September 30, 2026, our crew completed the entire 53.33-square tear-off and installation in a single day (captured in 240 during-build and 52 completed photos), backed by our insurance claims and supplement team, followed on October 1 by 180 LF of LeafBlaster Pro™ micro-mesh gutter guards to keep oak leaves and pine needles out of the drainage system for good.
Homeowner Review: Project #1050
Welcome the opportunity to share how professional, timely, communication, cleanliness and overall high satisfaction with the planning, claim management and execution of installing our new roof on September 30, 2026.
Jesse provided exceptional planning and product selection information, professional coordination with insurance adjusters, logistic coordination of all materials and well executed tear off and replacement in one day!
He provided an on site project manager to assure his instructions and any details were handled quickly and in good order while he was offsite. There were many moving parts and coordination to make this happen smoothly. The product quality was superb and installation from my observation of the process was orderly, smooth, professional grade and ended with a completely clean job site by days end. The roof texture and color turned out GREAT
If you are in need of an assessment, repair or roof replacement, I HIGHLY RECOMMEND Roof Repair Specialist! Your will be well served!
Project #1050 Timeline: Inspection to Final Supplement in 50 Days
Homeowners often worry that insurance roof replacements drag on for months. Here is the exact documented timeline from our file on this Gainesville, GA restoration:
Pre-Construction Drone Diagnostic & Same-Day Cincinnati Inspection
RRS conducts a drone diagnostic across the 4,615 sq. ft. brick ranch, and Cincinnati Insurance inspects the hail damage at 4:44 PM.
Cincinnati Insurance Issues Full Replacement Approval in 48 Hours
Just two days after inspection, Cincinnati approves full replacement (46.15 SQ tear-off, 407.50 LF drip edge & starter, 309.24 SF Ice & Water barrier, and 167.55 LF ridge cap).
Thunderstorm Gray Selection w/ Bronze W-Valleys & LeafBlaster Pro™
The homeowner selects TAMKO Titan XT® (Thunderstorm Gray) plus 18" Dark Bronze W-valleys, MasterGuard™ Warranty, and 180 LF of LeafBlaster Pro™ gutter guards for a cooler-weather build.
Complete Tear-Off, Bronze W-Valley Install & 180 LF LeafBlaster Pro™
Our crew strips and rebuilds all 12 facets in one day on September 30 with 192 LF of ridge vent and 110 LF of Dark Bronze W-valleys, followed by 180 LF of LeafBlaster Pro™ gutter guards on October 1.
5 Critical Supplements Approved by Cincinnati Insurance
When Cincinnati Insurance issued their initial estimate on August 13, 2026, several crucial waterproofing, flashing, and ventilation components were either omitted or priced using basic builder-grade alternatives. Our supplement team submitted photographic documentation and code justifications, getting all 5 items approved on August 13, 2026:
| Component | Initial Adjuster Scope (August 13, 2026) | RRS Supplemented Scope (August 13, 2026) | Code/System Justification |
|---|---|---|---|
| 1 18" Dark Bronze Open W-Valley Metal Upgrade (110 LF) + 400 SF Ice & Water Barrier | Initial Adjuster Scope: Scoped closed-cut shingle valleys with 309.24 Sq. Ft. of Ice & Water valley barrier | RRS Supplemented Scope: Upgraded: 11 Sections (110 LF) of 18" Dark Bronze W-Valley Metal over 400 SF Ice & Water | Code / System Justification: Across 92 feet 7 inches of multi-wing valleys carrying heavy roof runoff, open 18-inch Dark Bronze W-valley metal channels water cleanly off the roof without exposed shingle cuts, adding both storm durability and crisp architectural contrast. |
| 2 Zero-Shortage Material Buffer (53.33 SQ / 160 Bundles Installed vs. 49.00 SQ Scoped) | Initial Adjuster Scope: Scoped 49.00 SQ shingles (6.2% waste) across a 46.15 SQ 12-facet multi-wing roof | RRS Supplemented Scope: Installed 53.33 SQ (160 Bundles) TAMKO Titan XT®, 5 Bundles TAMKO Starter & 6 Bundles Hip & Ridge | Code / System Justification: With 92' 7" of valleys, 203' 9" of rakes, and 12 facets, a 6.2% waste factor leaves razor-thin margins. RRS installed 53.33 SQ of TAMKO Titan XT® plus 5 bundles (525 LF) of TAMKO Perforated Starter and 6 bundles (198 LF) of TAMKO Hip & Ridge caps. |
| 3 Doubled-Plus Continuous Ridge Ventilation (192 LF Installed vs. 80 LF Scoped) | Initial Adjuster Scope: Scoped 80.00 LF of continuous ridge vent across 167.19 LF of actual ridge lines | RRS Supplemented Scope: Upgraded: 48 Four-Foot Sections (192 LF Capacity) of High-Airflow Ridge Vent | Code / System Justification: With 161' 11" to 167.19 LF of ridges spanning four separate roof wings, venting only 80 LF leaves half the attic unvented. Installing continuous ridge vent across the full ridge line lowers attic heat and preserves shingle life. |
| 4 Omitted Sidewall Step Flashing (100 Pcs / 44' 9"), 490 LF Black Drip Edge & 2 OSB Sheets | Initial Adjuster Scope: Omitted 44' 9" of sidewall step flashing & 0 sheets of OSB wood decking replacement | RRS Supplemented Scope: Installed: 100 Pcs Black 4"×4"×8" Step Flashing, 49 Pcs (490 LF) 5" Black Drip Edge & 2 OSB Sheets | Code / System Justification: We replaced all 44' 9" of sidewall step flashing with new pre-bent Black aluminum step flashing, wrapped all 411 LF of perimeter eaves and rakes in 5" Black aluminum drip edge, and replaced compromised 7/16" OSB decking. |
| 5 TAMKO MasterGuard™ Warranty & 180 LF LeafBlaster Pro™ Micro-Mesh Gutter Guards | Initial Adjuster Scope: Standard manufacturer warranty & unguarded gutters exposed to Lake Lanier oak & pine debris | RRS Supplemented Scope: Upgraded: TAMKO MasterGuard™ Warranty + 180 LF LeafBlaster Pro™ Stainless Micro-Mesh Guards | Code / System Justification: Under heavy North Hall tree canopy, LeafBlaster Pro™ Z-bend stainless steel micro-mesh guards block oak leaves and pine needles from clogging gutters while TAMKO MasterGuard™ upgrades long-term system protection. |
Complete Roofing System Installed on Project #1050
A durable roof is more than just shingles. Below is the verified specification sheet of every component installed on this 4,615 sq. ft. measured area (53.33 squares installed with steep-cut waste) steep-slope roof in Gainesville, GA:
TAMKO Titan XT® Premium Architectural Shingles
Color: Thunderstorm Gray • 53.33 Squares Installed with Steep-Cut Waste (160 Bundles vs. 49.00 SQ Carrier Scope) • Upgraded TAMKO MasterGuard™ Warranty & 160 MPH Wind Rating
TAMKO 12-1/4"×12" Hip & Ridge Shingles
Color: Thunderstorm Gray • 6 Bundles (198 LF Capacity) Installed Across All 161 ft 11 in (167.19 LF) of Multi-Wing Ridges
18" Dark Bronze W-Valley Metal (110 Linear Feet)
11 Ten-Foot Sections (110 LF) of 18" Dark Bronze W-Valley Metal Installed Over 2 Rolls (400 SF) of Self-Adhering Ice & Water Barrier Across 92' 7" of Valleys
TAMKO 40"×6-5/8" Perforated Shingle Starter Course
Factory-Adhesive Eave & Rake Starter • 5 Bundles (525 LF Capacity) Covering All 411 ft 4 in of Eaves (207' 6") & Rakes (203' 9")
TAMKO Synthetic Guard™ 42"×286' Underlayment
6 Rolls (60 Squares Total at 10 SQ/Roll) Fastened w/ 6,000 1" Plastic Cap Nails Across All 4,615 Sq. Ft.
192 LF 4' High-Airflow Ridge Vent w/ Nails
48 Sections (192 LF Capacity vs. 80 LF Scoped) Installed Across Multi-Wing Ridges + Power Attic Vent Cover Detach & Reset
5" Black Drip Edge, 100 Pcs Step Flashing & Slate-Painted Hard Pipe Boots
49 Pcs (490 LF) 5" Black Aluminum Drip Edge • 100 Pcs Black 4"×4"×8" Step Flashing (44' 9") • 4 Slate-Painted 4" Hard Pipe Flashings • 2 Sheets 7/16" OSB
LeafBlaster Pro™ Z-Bend Stainless Micro-Mesh Gutter Guards
180 Linear Feet of LeafBlaster Pro™ Aluminum-Rail Micro-Mesh Gutter Toppers Installed Following Roof Completion
Frequently Asked Questions About Project #1050
Why did the homeowner upgrade from closed-cut shingle valleys to 18-inch Dark Bronze W-Valley metal on Project #1050?
How quickly did Cincinnati Insurance approve the roof replacement after the August 11 inspection?
Can Roof Repair Specialists schedule a build for cooler weather or upgrade my warranty and gutter guards?
Why did RRS install 48 sections (192 LF capacity) of continuous ridge vent instead of the 80 LF initially scoped?
Project #1050 Specs
- Location:
- Gainesville, GA 30506
- Corridor:
- North Hall / Lake Lanier Corridor
- Carrier:
- Cincinnati Insurance
- Cause of Loss:
- Hail Storm Damage
- Claim Approved:
- August 13, 2026
- Roof Built:
- September 30, 2026 (1-Day Build)
- Supplements Final:
- August 13, 2026 (+5 Items)
- Shingle Brand:
- TAMKO
- Model & Color:
- Titan XT® Architectural (MasterGuard™ Warranty) (Thunderstorm Gray)
- Roof Pitch & Size:
- 53.3 SQ • 5/12 Pitch • W-Valleys
Free Storm & Claim Inspection
Suspect hail or wind damage on your roof? We provide free drone inspections, honest assessments, and full insurance claim advocacy across Gainesville and North Georgia.
Featured Highlights & Complete Photo Archive (308 Photos)
Featuring the 15 top project highlights below, followed by collapsible archive sections containing every remaining inspection and production photo. Click any photo to enlarge.
After #1
After #6
After #17
After #19
After #45
Before #1
Before #6
Before #12
During #68
During #122
During #128
During #134
During #167
During #177
During #216
Browse Remaining 293 Inspection & Build Photos by Stage
Before Inspection & Damage Photos 13 More
Before #2
Before #3
Before #4
Before #5
Before #7
Before #8
Before #9
Before #10
Before #11
Before #13
Before #14
Before #15
Before #16
During Build & Installation Photos 233 More
During #1
During #2
During #3
During #4
During #5
During #6
During #7
During #8
During #9
During #10
During #11
During #12
During #13
During #14
During #15
During #16
During #17
During #18
During #19
During #20
During #21
During #22
During #23
During #24
During #25
During #26
During #27
During #28
During #29
During #30
During #31
During #32
During #33
During #34
During #35
During #36
During #37
During #38
During #39
During #40
During #41
During #42
During #43
During #44
During #45
During #46
During #47
During #48
During #49
During #50
During #51
During #52
During #53
During #54
During #55
During #56
During #57
During #58
During #59
During #60
During #61
During #62
During #63
During #64
During #65
During #66
During #67
During #69
During #70
During #71
During #72
During #73
During #74
During #75
During #76
During #77
During #78
During #79
During #80
During #81
During #82
During #83
During #84
During #85
During #86
During #87
During #88
During #89
During #90
During #91
During #92
During #93
During #94
During #95
During #96
During #97
During #98
During #99
During #100
During #101
During #102
During #103
During #104
During #105
During #106
During #107
During #108
During #109
During #110
During #111
During #112
During #113
During #114
During #115
During #116
During #117
During #118
During #119
During #120
During #121
During #123
During #124
During #125
During #126
During #127
During #129
During #130
During #131
During #132
During #133
During #135
During #136
During #137
During #138
During #139
During #140
During #141
During #142
During #143
During #144
During #145
During #146
During #147
During #148
During #149
During #150
During #151
During #152
During #153
During #154
During #155
During #156
During #157
During #158
During #159
During #160
During #161
During #162
During #163
During #164
During #165
During #166
During #168
During #169
During #170
During #171
During #172
During #173
During #174
During #175
During #176
During #178
During #179
During #180
During #181
During #182
During #183
During #184
During #185
During #186
During #187
During #188
During #189
During #190
During #191
During #192
During #193
During #194
During #195
During #196
During #197
During #198
During #199
During #200
During #201
During #202
During #203
During #204
During #205
During #206
During #207
During #208
During #209
During #210
During #211
During #212
During #213
During #214
During #215
During #217
During #218
During #219
During #220
During #221
During #222
During #223
During #224
During #225
During #226
During #227
During #228
During #229
During #230
During #231
During #232
During #233
During #234
During #235
During #236
During #237
During #238
During #239
During #240
After Completion Photos 47 More
After #2
After #3
After #4
After #5
After #7
After #8
After #9
After #10
After #11
After #12
After #13
After #14
After #15
After #16
After #18
After #20
After #21
After #22
After #23
After #24
After #25
After #26
After #27
After #28
After #29
After #30
After #31
After #32
After #33
After #34
After #35
After #36
After #37
After #38
After #39
After #40
After #41
After #42
After #43
After #44
After #46
After #47
After #48
After #49
After #50
After #51
After #52
Get the Same Fast Turnaround & Insurance Advocacy for Your Roof.
From initial storm documentation and adjuster meetings to code-compliant supplement approvals and 1-day installations, Roof Repair Specialists handles every detail with integrity.
What Our Clients Say
About the RRS Experience.
“ I can’t say enough great things about Roof Repair Specialists. They handled the entire process of replacing six roofs on my investment properties and made it absolutely seamless.
“ We had a great experience working with Roof Repair Specialists. They were extremely professional and swift to respond and complete the work we needed. I would highly recommend them to others!
“ Punctual and got their job done. Most importantly no more leaks!
“ Highly recommend. Excellent communication, Quality work. Fair prices. They were on time and gave updates along the way.