Allstate Catastrophe Team Steep-Slope Wind & Hail Roof Replacement in Braselton, GA
When a severe September 5, 2026 windstorm and hail event damaged this two-story Braselton home, Roof Repair Specialists completed a drone diagnostic within 48 hours, installed emergency synthetic dry-in protection on September 10, and secured next-day Allstate National Catastrophe approval on September 17. Twelve days later on September 29–30, our crew installed a 31.67-square all-TAMKO Titan XT® (Weathered Wood) roof system documented by 256 during-build photos.
How We Restored This Steep-Slope Braselton Roof in 12 Days
Located along the Highway 211 and Château Élan corridor in Braselton (part of our Northeast Georgia service areas), this two-story traditional residence features twin steep 10/12 front gables and 10 facets totaling 2,671 sq. ft. measured area (31.67 squares installed with steep-cut waste), with 52' 7" of valleys, 81' 3" of sidewall step flashing, and 28' 3" of headwall flashing. On September 5, 2026, a severe windstorm and hail cell tore shingles across the steep slopes and dented 32 LF of downspouts.
Within 48 hours on September 7, 2026, our team conducted a drone diagnostic so the claim could be filed that evening, then returned on September 10 to install emergency synthetic dry-in protection before rain could enter the home. On September 16, Allstate's National Catastrophe Team inspected the home and issued next-day roof replacement approval on September 17. However, Allstate's initial worksheet excluded both eave and rake starter courses, scoped only 32.35 LF of hip/ridge cap across 78' 9" of ridges and hips, scoped only 42 LF of ridge vent, and omitted 81' 3" of step flashing and 28' 3" of headwall flashing.
Just 48 hours after a September 5 storm, we completed a drone diagnostic and emergency synthetic dry-in, securing next-day Allstate Catastrophe approval on September 17 and installing a complete 31.67-square all-TAMKO Titan XT® (Weathered Wood) system just 12 days later.
On September 21, the homeowner selected TAMKO Pro Diamond-installed TAMKO Titan XT® architectural shingles in Weathered Wood and asked us to remove an unused rooftop satellite dish. On September 29–30 (just 12 days after Allstate's approval), our crew stripped the storm-damaged shingles and emergency dry-in, removed the obsolete satellite dish and sealed the penetrations, replaced 2 compromised OSB sheets, and installed an all-TAMKO system with TAMKO Moisture Guard™ in every valley, TAMKO Synthetic Guard™ across the deck, 420 LF capacity of Perforated Starter, 350 LF of 5" Black drip edge, 200 Black step flashings, 30 LF of Black angle flashing, and 68 LF of ridge vent.
Completed September 29–30, 2026 (12 days after Allstate's September 17 approval and backed by our insurance claims and supplement team), this Braselton residence is now protected by a complete all-TAMKO Titan XT® Weathered Wood roof with 160 MPH AnchorLock™ wind protection, full-perimeter Black drip edge, TAMKO Moisture Guard™ valley protection, new sidewall and headwall flashings, and approved downspout restoration.
Project #1131 Timeline: Inspection to Final Supplement in 22 Days
Homeowners often worry that insurance roof replacements drag on for months. Here is the exact documented timeline from our file on this Braselton, GA restoration:
Severe Windstorm & Hail Strikes Braselton's Hwy 211 Corridor
Late-afternoon windstorms and hail hit Braselton, tearing laminated shingles across the 6/12 and 10/12 roof facets and damaging 32 LF of 5-inch aluminum downspouts.
Drone Diagnostic & Emergency Synthetic Dry-In Protection
RRS documents the storm damage within 48 hours and returns on September 10 to install emergency synthetic underlayment dry-in so rain cannot enter the home before the adjuster arrives.
Allstate Catastrophe Inspection & Full Replacement Approval
Allstate's National Catastrophe Team inspects the home on September 16 and issues written approval on September 17 including 2-story high-roof labor, 10/12 steep charges, temporary repairs, and 32 LF of downspouts.
Weathered Wood Selection & Satellite Dish Removal Plan
The homeowner locks in TAMKO Titan XT® architectural shingles in Weathered Wood and requests permanent removal of an unused rooftop satellite dish.
Complete Tear-Off, OSB Decking Repair & All-TAMKO Titan XT® Install
Just 12 days after Allstate approval, our steep-slope crew removes the old roof and obsolete satellite dish, replaces 2 rotted OSB sheets, installs 200 step flashings and 68 LF of ridge vent, and completes the Weathered Wood roof with 256 during-build photos.
5 Critical Supplements Approved by Allstate Insurance
When Allstate Insurance issued their initial estimate on September 17, 2026, several crucial waterproofing, flashing, and ventilation components were either omitted or priced using basic builder-grade alternatives. Our supplement team submitted photographic documentation and code justifications, getting all 5 items approved on September 17, 2026:
| Component | Initial Adjuster Scope (September 17, 2026) | RRS Supplemented Scope (September 17, 2026) | Code/System Justification |
|---|---|---|---|
| 1 Zero-Starter & Low-Waste Correction (31.67 SQ + 4 Bundles TAMKO Starter) | Initial Adjuster Scope: Scoped 27.00 SQ shingles (8.4% waste) with 'Include eave starter: No, Include rake starter: No' | RRS Supplemented Scope: Corrected & Installed: 31.67 SQ (95 Bundles) TAMKO Titan XT® + 4 Bundles (420 LF) TAMKO Perforated Starter | Code / System Justification: Allstate's initial scope excluded both eave and rake starter courses across 325 linear feet of perimeter. We installed 4 full bundles (420 LF capacity) of factory-adhesive TAMKO Perforated Shingle Starter plus 31.67 squares of TAMKO Titan XT® to cover every cut across the 10/12 gables and 52' 7" of valleys. |
| 2 Omitted Sidewall Step Flashing (200 Pcs / 81' 3") & Headwall Angle Flashing (30 LF / 28' 3") | Initial Adjuster Scope: 0 LF of sidewall step flashing & 0 LF of headwall flashing scoped on the September 17 estimate | RRS Supplemented Scope: Installed: 200 Pcs Black 4"×4"×8" Step Flashing & 3 Pcs (30 LF) Black 29-Gauge 4"×4"×10' Angle Flashing | Code / System Justification: With 81 feet 3 inches of step flashing along the two-story sidewalls and 28 feet 3 inches of headwall flashing above the lower garage/porch transitions, reusing old corroded metal risks leaks. We installed 200 new Black step flashings and 30 LF of Black 29-gauge angle flashing. |
| 3 Hip & Ridge Cap Expansion (99 LF vs. 32.35 LF Scoped) & 68 LF Ridge Vent | Initial Adjuster Scope: Scoped only 32.35 LF of hip/ridge cap & 42.00 LF of ridge vent across 78' 9" of actual hips & ridges | RRS Supplemented Scope: Upgraded: 3 Bundles (99 LF) TAMKO 12-1/4"×12" Hip & Ridge + 17 Sections (68 LF) 4' Ridge Vent | Code / System Justification: 3D aerial geometry verified 68 feet 11 inches of ridges and 9 feet 10 inches of hips (78' 9" total), more than double the 32.35 LF initially scoped. We installed 3 full bundles of matching TAMKO Weathered Wood Hip & Ridge caps over 68 LF of continuous high-airflow ridge vent. |
| 4 Emergency Synthetic Dry-In (Sept 10) + TAMKO Moisture Guard™ Valley Liner & 2 OSB Sheets | Initial Adjuster Scope: Scoped 6.90 SF tarp & 15-lb felt with 0 SF Ice & Water barrier and 0 sheets of OSB decking | RRS Supplemented Scope: Installed: Emergency Dry-In, 1 Roll (200 SF) TAMKO Moisture Guard™, 40 SQ Synthetic Guard™ & 2 OSB Sheets | Code / System Justification: Instead of leaving torn shingles exposed before inspection, we dried in the damaged area with synthetic underlayment on September 10, then rebuilt the roof with 2 sheets of 7/16" OSB decking, 200 Sq. Ft. of self-adhering TAMKO Moisture Guard™ in the valleys, and 40 squares of TAMKO Synthetic Guard™. |
| 5 Two-Story High-Roof (22.05 SQ), 10/12 Steep Charges & 32 LF of 5" Aluminum Downspouts | Initial Adjuster Scope: Often missed on standard exterior scopes when only the main roof slopes are inspected | RRS Supplemented Scope: Approved on Sept 17 Allstate Scope: 22.05 SQ High-Roof, 6.67 SQ 10/12 Steep & 32 LF Downspouts | Code / System Justification: During our diagnostic and Allstate's Catastrophe Team inspection, we ensured full recognition of the two-story height (22.05 SQ), steep 10/12 front gables (6.67 SQ), and collateral hail/wind damage to 32 linear feet of 5-inch aluminum downspouts on the right and back elevations. |
Complete Roofing System Installed on Project #1131
A durable roof is more than just shingles. Below is the verified specification sheet of every component installed on this 2,671 sq. ft. measured area (31.67 squares installed with steep-cut waste) steep-slope roof in Braselton, GA:
TAMKO Titan XT® Premium Architectural Shingles
Color: Weathered Wood • 31.67 Squares Installed with Steep-Cut Waste (95 Bundles Across 10 Facets at 6/12 & 10/12 Pitches) • AnchorLock™ 160 MPH Wind Rating
TAMKO 12-1/4"×12" Hip & Ridge Shingles
Color: Weathered Wood • 3 Bundles (99 LF Capacity vs. 32.35 LF Scoped) Installed Across All 68' 11" of Ridges & 9' 10" of Hips
TAMKO 40"×6-5/8" Perforated Shingle Starter Course
Factory-Adhesive Eave & Rake Starter • 4 Bundles (420 LF Capacity) Covering All 325 LF of Eaves (115' 2") & Rakes (209' 10")
TAMKO Synthetic Guard™ 42"×286' Underlayment
4 Rolls (40 Squares Total at 10 SQ/Roll) Fastened w/ 3,000 1" Plastic Cap Nails Across All 2,671 Sq. Ft.
TAMKO Moisture Guard™ Ice & Rain Underlayment (36"×64.5')
1 Roll (200 Sq. Ft.) Installed Along All 52 ft 7 in of Steep-Slope Valleys & Critical Roof-to-Wall Intersections
68 LF 4' High-Airflow Ridge Vent w/ Nails
17 Pieces (68 Linear Feet Capacity vs. 42 LF Scoped) Installed Across All Main Two-Story & Garage Ridges
5" Black Drip Edge, 200 Pcs Step Flashing & 30 LF Black Angle Flashing
35 Pcs (350 LF) 5" Black Aluminum Drip Edge • 200 Pcs Black 4"×4"×8" Step Flashing (81' 3") • 3 Pcs (30 LF) Black 29-Ga 4"×4"×10' Angle Flashing (28' 3")
7/16" OSB Sheathing, Weathered-Wood Pipe Boots & 32 LF Downspouts
2 Sheets 4'×8' 7/16" OSB • 4 Black 3" Adjustable Pipe Flashings Painted Weathered Wood w/ Polyurethane Sealant • 32 LF 5" Aluminum Downspouts
Frequently Asked Questions About Project #1131
Why did Roof Repair Specialists install an emergency synthetic dry-in on September 10 before Allstate even inspected the roof?
Why are there 256 during-build photos documented on Project #1131?
How did RRS catch the missing starter course and hip/ridge cap shortage on Allstate's initial estimate?
Can Roof Repair Specialists remove an unused satellite dish and restore damaged downspouts during a roof replacement?
Project #1131 Specs
- Location:
- Braselton, GA 30517
- Corridor:
- Highway 211 / Braselton & Château Élan Corridor
- Carrier:
- Allstate Insurance
- Cause of Loss:
- Windstorm & Hail Damage
- Claim Approved:
- September 17, 2026
- Roof Built:
- September 29–30, 2026 (1-Day Build)
- Supplements Final:
- September 17, 2026 (+5 Items)
- Shingle Brand:
- TAMKO
- Model & Color:
- Titan XT® Architectural (Weathered Wood)
- Roof Pitch & Size:
- 31.7 SQ • 6/12 & 10/12 Pitch
Free Storm & Claim Inspection
Suspect hail or wind damage on your roof? We provide free drone inspections, honest assessments, and full insurance claim advocacy across Braselton and North Georgia.
Featured Highlights & Complete Photo Archive (296 Photos)
Featuring the 14 top project highlights below, followed by collapsible archive sections containing every remaining inspection and production photo. Click any photo to enlarge.
After #3
After #4
After #10
After #16
After #20
Before #2
Before #10
Before #13
During #57
During #72
During #98
During #99
During #137
During #230
Browse Remaining 282 Inspection & Build Photos by Stage
Before Inspection & Damage Photos 17 More
Before #1
Before #3
Before #4
Before #5
Before #6
Before #7
Before #8
Before #9
Before #11
Before #12
Before #14
Before #15
Before #16
Before #17
Before #18
Before #19
Before #20
During Build & Installation Photos 250 More
During #1
During #2
During #3
During #4
During #5
During #6
During #7
During #8
During #9
During #10
During #11
During #12
During #13
During #14
During #15
During #16
During #17
During #18
During #19
During #20
During #21
During #22
During #23
During #24
During #25
During #26
During #27
During #28
During #29
During #30
During #31
During #32
During #33
During #34
During #35
During #36
During #37
During #38
During #39
During #40
During #41
During #42
During #43
During #44
During #45
During #46
During #47
During #48
During #49
During #50
During #51
During #52
During #53
During #54
During #55
During #56
During #58
During #59
During #60
During #61
During #62
During #63
During #64
During #65
During #66
During #67
During #68
During #69
During #70
During #71
During #73
During #74
During #75
During #76
During #77
During #78
During #79
During #80
During #81
During #82
During #83
During #84
During #85
During #86
During #87
During #88
During #89
During #90
During #91
During #92
During #93
During #94
During #95
During #96
During #97
During #100
During #101
During #102
During #103
During #104
During #105
During #106
During #107
During #108
During #109
During #110
During #111
During #112
During #113
During #114
During #115
During #116
During #117
During #118
During #119
During #120
During #121
During #122
During #123
During #124
During #125
During #126
During #127
During #128
During #129
During #130
During #131
During #132
During #133
During #134
During #135
During #136
During #138
During #139
During #140
During #141
During #142
During #143
During #144
During #145
During #146
During #147
During #148
During #149
During #150
During #151
During #152
During #153
During #154
During #155
During #156
During #157
During #158
During #159
During #160
During #161
During #162
During #163
During #164
During #165
During #166
During #167
During #168
During #169
During #170
During #171
During #172
During #173
During #174
During #175
During #176
During #177
During #178
During #179
During #180
During #181
During #182
During #183
During #184
During #185
During #186
During #187
During #188
During #189
During #190
During #191
During #192
During #193
During #194
During #195
During #196
During #197
During #198
During #199
During #200
During #201
During #202
During #203
During #204
During #205
During #206
During #207
During #208
During #209
During #210
During #211
During #212
During #213
During #214
During #215
During #216
During #217
During #218
During #219
During #220
During #221
During #222
During #223
During #224
During #225
During #226
During #227
During #228
During #229
During #231
During #232
During #233
During #234
During #235
During #236
During #237
During #238
During #239
During #240
During #241
During #242
During #243
During #244
During #245
During #246
During #247
During #248
During #249
During #250
During #251
During #252
During #253
During #254
During #255
During #256
After Completion Photos 15 More
After #1
After #2
After #5
After #6
After #7
After #8
After #9
After #11
After #12
After #13
After #14
After #15
After #17
After #18
After #19
Get the Same Fast Turnaround & Insurance Advocacy for Your Roof.
From initial storm documentation and adjuster meetings to code-compliant supplement approvals and 1-day installations, Roof Repair Specialists handles every detail with integrity.
What Our Clients Say
About the RRS Experience.
“ I can’t say enough great things about Roof Repair Specialists. They handled the entire process of replacing six roofs on my investment properties and made it absolutely seamless.
“ We had a great experience working with Roof Repair Specialists. They were extremely professional and swift to respond and complete the work we needed. I would highly recommend them to others!
“ Punctual and got their job done. Most importantly no more leaks!
“ Highly recommend. Excellent communication, Quality work. Fair prices. They were on time and gave updates along the way.